top of page

Casino Long Xin - installation of the Pre-Craft elements

Installation process. The wall cladding was installed quickly, but in order to avoid dust on the finished walls, we make an additional coating (protection).

Light is ready to install.

A-MDM Awards & News

Latest Design

Interior Design and Pre-Crafting

A-MDM Post's Archive

Follow Us

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page