top of page

SUBWAY fast food store in Beijing railway station

  • A-MDM
  • Apr 29, 2016
  • 1 min read

Kiosk for "SUBWAY".

Location - Beijing Railway Station, Shanghai

Time Limits: Design service - 14 days. Prefabrication + preparation + installation - 25 days

1. Design Service Phase:

To Design for such brands like "SUBWAY" is a challenge. Key point is to balancing between brand design standards and create right emotion for customers. Here big influence played - non standard location, Brand demands, Landlord demands, neighboring and ets.

2. Prefabrication and Construction preparation:

Prefabrication start parallelly with construction and engineering preparation. TIME is twise shorter than in regular construction. Minimum Noice and NO SMELL!

3. Installation.

1 Comment


gdbcjspy56
Apr 22
Like

A-MDM Awards & News

Prefab Latest Design

Interior Design and Pre-Crafting

A-MDM Post's Archive

Follow Us

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Archproject - MDM

ODESA

A-MDM Architecture, Manufacturing, Design, Managing

SHANGHAI

曹杨路1040弄1号1765室

Shanghai, Putuo, CaoYang road lane 1040 bld 1 office 1765

e-mail: office@a-mdm.com

© Copyright 2025 A-MDM Corp. All Rights Reserved

WeChat QR code

WECHAT A-MDM.jpg

WhatsApp

WATSUP A-MDM.jpg

LINE

LINE A-MDM.jpg
bottom of page